Northumberland road closures: parts of A1 and A69 to avoid this week

There are numerous road closures across the county this week.There are numerous road closures across the county this week.
There are numerous road closures across the county this week.
Drivers in and around Northumberland have 13 road closures to watch out for, and two of them are expected to cause delays of between 10 and 30 minutes.

The latest expected works list, with notes from National Highways, shows that one closure already in place is expected to continue for several days:

• A1, until 6am September 10, moderate delays (10-30 minutes): A1 northbound and southbound. Highfields to Scottish border, contraflow, traffic signals and lane closures with speed restrictions, 24-hour lane closures when contraflow no in operation and 24-hour layby closures for resurfacing works.

Hide Ad
Hide Ad

• A1, until 4pm on August 25, moderate delays (10-30 minutes): A1 northbound and southbound, Morpeth to Low Espley, carriageway closure and Lane closure for inspection/survey on behalf of Highways England;

• A1, until 3.30pm on August 24, slight delays (under 10 minutes): A1 southbound, Alnwick to West Cawledge, Lane closure for horticultural work;

• A1, until 6am on September 1, slight delays (under 10 minutes): A1 northbound and southbound, Felton to West Cawledge Park, Lane closure for horticultural works;

• A1, until 6am on August 24, slight delays (under 10 minutes): A1 northbound, Shotton to Stannington, Lane closure for vehicle safety fence repair.

Hide Ad
Hide Ad

And a further 13 closures will begin over the next seven days:

• A1, from 8am August 30 to 6pm September 4, slight delays (under 10 minutes): A1 northbound and southbound, West Mains, traffic signals for event;

• A69, from 9am August 30 to 4pm September 26, slight delays (under 10 minutes): A69 Warden / Two mile cottages, junction to Acomb, junction – lane closures to carry out routine maintenance safely;

• A1, from 8pm August 30 to 6am September 3, slight delays (under 10 minutes): A1 northbound and southbound, Wooler to Scremerston Roundabout, two-way signals for inspection/survey;

Hide Ad
Hide Ad

• A1, from 9.30am to 3.30pm on September 1, slight delays (under 10 minutes): A1 northbound and southbound, Felton to Newton on the Moor, lane closure for drainage works;

• A69, from 9am to 4pm on September 2, slight delays (under 10 minutes): A69 Anick Grange to Acomb - W/B slow lane closure to carry out routine maintenance;

• A69, from 9am September 5 to 4pm September 6, slight delays (under 10 minutes): A69 Anick to Stagshaw, near Corbridge – slow lane closures to carry out routine maintenance safely;

• A1, from 9.30am to 3.30pm on September 5, slight delays (under 10 minutes): A1 northbound and southbound, West Cawledge to Denwick, Lane closures for drainage works;

Hide Ad
Hide Ad

• A1, from 8pm September 5 to 6am September 9, slight delays (under 10 minutes): A1 northbound and southbound, Stannington Interchange to Clifton, Lane closure for drainage works.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.